Kanakapura Road infrastructure pipeline 2026-2030

The Kanakapura Road infrastructure pipeline 2026-2030 is a 12,000-crore transport plan. It links a 60-km ring road section and a 10-km metro line. This plan widens National Highway 948 (NH-948) from 4 lanes to 6 lanes with side lanes. State teams aim to handle 45% more daily cars between Sarakki and Harohalli over five years.
This plan builds flyovers and underpasses at busy spots like Sarakki Junction and Konanakunte Cross. Better roads and metro tracks have pushed home prices up by 9.2% each year. Average 2026 home rates sit between 9,000 and 16,500 rupees per square foot across South Bangalore. As drive times drop by 35 minutes between Silk Institute and central work areas, Kanakapura Road is turning into a top home location.